Planning building works? LENIO prepares and serves your Party Wall Notice in London under the Party Wall etc. Act 1996, whether it is a Section 1, Section 3 or Section 6 notice, confirming exactly which your project needs and serving it correctly on every affected neighbour. Every notice is handled personally by a Chartered Civil and Building Engineer (ICE and CABE).

The Basics

What Is a Party Wall Notice?

Planning an extension, loft conversion or basement works in London? LENIO identifies the correct notice, prepares it to the requirements of the Party Wall etc. Act 1996 and serves it on your behalf.

A Party Wall Notice is a formal document served on a neighbouring property owner before certain building works begin. It is a legal requirement under the Act, not an optional courtesy.

Importantly, a notice is not a request for permission. It is a notice of intent. You are not asking whether you may build. You are fulfilling a statutory duty to tell your neighbour what is planned so that both properties are protected.

The notice informs your neighbour of the proposed works, the intended start date and their rights under the Act. Once served, your neighbour has 14 days to respond. Their response determines the next stage of the party wall process.

Serving the correct notice at the right time is the first and most important step for any Building Owner in London.

Neighbours maintaining a friendly relationship while discussing building works near a fence
Is Your Project Notifiable?

Works That Require a Party Wall Notice

Not all building work requires a Party Wall Notice. However, many common London renovation projects do fall under the Act. Confirming whether your project is notifiable is the right first step before any work begins.

Work Type

Extensions

Rear and side extensions that involve excavation near a neighbouring foundation or construction close to a boundary line often require notice. This is one of the most common notifiable projects in London.

Work Type

Loft Conversions

Inserting steel beams into a party wall involves works carried out under section 2 of the Act, notified by a Party Structure Notice under section 3. Most loft conversions in terraced or semi-detached London properties require this notice.

Work Type

Basement Works

Excavation near neighbouring structures triggers Section 6 of the Act. Basement works carry the highest party wall risk and require notice before any digging or foundation work begins on site.

Work Type

Chimney Breast Removal

Removing a chimney breast built into a party wall affects the shared structure. A Party Wall Notice must be served on the Adjoining Owner before this work begins.

Work Type

Boundary Wall Works

Building a new wall at or near the boundary falls under Section 1 of the Act. This includes garden walls, new structures and any works on an existing shared boundary line.

Work Type

Structural Works on a Shared Wall

Cutting into, raising, thickening or underpinning a party wall involves works carried out under section 2 of the Act. These are notified by a Party Structure Notice under section 3 before works begin.

Section 1, 3 & 6

The Three Main Types of Party Wall Notice

The Party Wall etc. Act 1996 covers three distinct types of works, each requiring a different notice. Serving the wrong notice, or missing one entirely, can invalidate the process and delay your project.

Section 1

Line of Junction Notice

1 month's notice

A Section 1 notice applies to new walls built at or on the boundary line between two properties. One month's notice is required before works begin. This notice is commonly needed for new garden walls and boundary structures.

Section 3

Party Structure Notice

2 months' notice

A Section 3 notice applies to works on an existing party wall or shared structure. Two months' notice is required before works begin. Loft conversions, chimney breast removals and structural alterations to shared walls typically require this notice.

Section 6

Adjacent Excavation Notice

1 month's notice

A Section 6 notice applies to excavation within 3 metres or 6 metres of a neighbouring structure, depending on the depth of the works. One month's notice is required. Basement works and deep foundation projects most commonly trigger this notice. Drawings showing the depth and position of the excavation must accompany the notice.

Validity Checklist

What a Valid Party Wall Notice Must Contain

A notice that omits any of these details can be treated as defective. If that happens, a fresh notice must be served and the full statutory period starts again from zero.

Must include

The required details

  • The Building Owner's full name and address
  • The address of the property where works will happen
  • A clear description of the proposed works, in plain language
  • The intended start date for the works
  • The date the notice is served
  • Drawings showing depth and position, for excavation notices

The description matters more than people expect. A vague line such as "some building work" is not sufficient, and a neighbour can later argue they never understood the scope of what was proposed.

Common errors

What invalidates a notice

  • Addressing it to "the occupier" rather than the legal owner
  • Missing one of several affected Adjoining Owners
  • Serving a leaseholder but not the freeholder, or the reverse
  • Getting the name or address slightly wrong
  • No start date, or a start date inside the notice period
  • A works description too vague to be understood

An invalid notice has no legal effect at all. Everything built on top of it, including any Award, can be challenged.

Get The Owners Right

Who Must Receive the Notice?

A Party Wall Notice must be served on every affected Adjoining Owner. Under the Act, that means anyone with an interest in the neighbouring property greater than a yearly tenancy. In practice this includes freeholders and leaseholders with more than a year remaining on their lease.

In a block of converted flats, this can mean serving several people: each affected leaseholder and the freeholder who owns the building. Where a property is jointly owned, every joint owner must be named. Missing any one of them leaves the notice defective for that owner.

Serving notice on "the occupier" is one of the most common errors we see. A tenant renting short term is usually not the Adjoining Owner for the purposes of the Act, so a notice addressed to them alone has no legal standing.

For this reason we carry out Land Registry checks as part of the initial review, confirming exactly who holds an interest in each affected property before any notice is drafted. It is a small step that removes one of the biggest causes of delay.

Low-angle view of London buildings against the sky
Plan Ahead

Party Wall Notice Periods: How Much Time Do You Need?

The Party Wall etc. Act 1996 sets fixed notice periods for each type of notice. These cannot be shortened without the written agreement of your neighbour. Planning ahead is the most practical way to avoid delays to your project.

1Month

One Month's Notice

A Section 1 notice and a Section 6 notice each require one month's notice before works begin. The notice period starts from the date the notice is correctly served on the Adjoining Owner, not from the date it is prepared.

2Months

Two Months' Notice

A Section 3 notice requires two months' notice before works begin. This is the most common notice period for London renovation projects, as most loft conversions and structural works on shared walls fall under Section 3.

More than one notice? In some projects, more than one notice type applies. In those cases, all relevant notices must be served correctly and the longest notice period governs when works can begin. LENIO identifies every notice your project requires and serves them all on your behalf.
Valid for 12 months. A Party Wall Notice is valid for 12 months from the date it is served. If works do not begin within that period, a fresh notice must be served. Serving notice too early can therefore create unnecessary complications if your start date shifts significantly.
Serving It Properly

How a Party Wall Notice Should Be Served

A notice is only "served" when it reaches the Adjoining Owner by a method the Act permits. The method matters as much as the wording, because a notice that was never validly served has no effect.

Preferred

First class post

Generally the most reliable route and well recognised. Posting to the Adjoining Owner's address starts the clock without requiring anyone to be at home.

Acceptable

Hand delivery

Valid, but you need to be able to evidence it. Delivering in person or through the letterbox works provided the date and manner of delivery are properly documented.

Conditional

Email

Only valid where the Adjoining Owner has confirmed in writing that they are willing to receive notices electronically at that address. Without that agreement, an emailed notice does not count.

A word on recorded delivery. It feels safer, but it can work against you. If nobody is home to sign for the item, it is not delivered, and therefore not served. Your notice period never starts and you may only discover the problem weeks later.
Three Possible Outcomes

What Happens After You Serve a Party Wall Notice

Serving the notice sets the process in motion. From that point, there are three possible outcomes and each one leads to a different next stage. Your neighbour has 14 days to respond, and their response determines how the party wall notice process continues.

Consents

Your Neighbour Consents

Your neighbour agrees to the proposed works in writing within 14 days. The process moves forward without the need for surveyor appointments. Works may then proceed, though a Schedule of Condition is still advisable before construction begins.

Dissents

Your Neighbour Dissents

Your neighbour formally objects to the proposed works. This does not stop the project. Instead, it triggers the statutory dispute resolution process under the Act and surveyors are appointed to prepare a Party Wall Award.

No Response

No Response After 14 Days

If your neighbour does not respond within 14 days, a dispute is treated as having arisen under the Act. This is known as deemed dissent. Surveyors must then be appointed even without a formal objection from your neighbour.

If There Is Still Silence

The 10 day rule keeps your project moving.

Deemed dissent is not the end of the road. Where an Adjoining Owner has not replied within 14 days, a further written request is served giving them 10 days to appoint a surveyor. This step is made under section 10(4) of the Act.

If they still do not appoint anyone within those 10 days, the Building Owner is entitled to appoint a surveyor on their behalf. That surveyor must still act impartially and protect the Adjoining Owner's interests, so the neighbour remains properly represented, but your project is no longer held up by inaction.

The practical point for Building Owners is this: a silent neighbour cannot block your build, but the formal Award route now applies, so allow time for it in your programme.

Before The Letter Arrives

Speak to your neighbour first. It changes everything.

A legal notice landing on the doormat with no warning is intimidating, and a neighbour who feels blindsided is far more likely to dissent. A short conversation beforehand, showing the drawings and explaining why you are building, removes most of that reaction before it forms.

It is also the natural moment to cover the practical things people actually worry about: how long the works will take, what the working hours will be, where the skip and scaffolding will go, and who to contact if something concerns them.

This costs nothing, frequently turns a dissent into a consent, and protects a relationship that will outlast the build by many years.

Be ready for unsolicited letters. Some firms monitor local planning portals and write directly to neighbours of approved applications, encouraging them to dissent so that the firm can be appointed. If your neighbour receives one of these, the best response is transparency: explain that a surveyor is already handling the matter properly and impartially, and that dissenting on the strength of a marketing letter helps nobody.

Not Sure Which Type of Party Wall Notice Your Project Needs?

Speak directly with a party wall surveyor in London. In one short call, we review your project, confirm which notices apply and tell you exactly what needs to happen next.

Our Notice Service

How LENIO Prepares and Serves Your Party Wall Notice

As your party wall surveyor in London, LENIO manages every stage of the notice process from initial review through to confirmed service on all affected Adjoining Owners.

LENIO party wall surveyor preparing a Party Wall Notice for a London property
1

Review Your Proposed Works

We assess your drawings and proposed works against the Party Wall etc. Act 1996. This confirms whether notices are required, which sections apply and which Adjoining Owners must be notified before works begin.

2

Identify All Affected Adjoining Owners

We identify every neighbouring property owner whose property may be affected, using Land Registry checks where needed. Serving notice on every affected Adjoining Owner is a legal requirement and a common source of error.

3

Prepare the Correct Notices

We prepare the correct Party Wall Notice for each affected Adjoining Owner. Every notice is drafted to the full requirements of the Act, including the correct works description, intended start date and statutory statement.

4

Serve the Notices Within the Correct Period

We serve all prepared notices by a valid method and within the correct notice period for each section. For Section 3 works, two months' notice is required. For Section 1 and Section 6 works, one month's notice applies.

5

Manage Responses and Next Steps

We follow up on every response and keep you informed throughout. If your neighbour consents, the process moves forward. If they dissent or do not reply, we manage the formal next steps under the Act, including the 10 day follow up request.

Get It Right First Time

Why Getting Your
Party Wall Notice Right Matters

An invalid or incorrectly served Party Wall Notice can set the entire process back. If the notice does not meet the requirements of the Act, the full notice period must restart from the date a valid notice is served. On a project with a booked contractor, that delay has a direct cost.

Free online templates are widely available and they are lawful to use. The difficulty is that they are generic, so they often lack the technical precision the Act expects, particularly in the description of works and the identification of owners. On a straightforward job with a friendly neighbour they may be fine. Where the works are complex or relations are delicate, a professionally drafted notice removes the validity risk entirely.

In London, party wall notice requirements arise on most renovation projects. Terraced houses, semi-detached homes and converted flats mean that shared walls and close boundary lines are the norm, not the exception.

LENIO is led by a Chartered Civil Engineer and Member of the Institution of Civil Engineers (ICE), and a Chartered Building Engineer and Member of the Chartered Association of Building Engineers (CABE). A chartered surveyor leads every instruction personally.

Useful official guidance: the GOV.UK party walls guide and the GOV.UK explanatory booklet, which includes example notice templates.

See also our Building Owner's Surveyor service, our party wall services in London, or find your local London area.

Areas We Cover

Serving Party Wall Notices Across London

We prepare and serve Party Wall Notices for Building Owners right across the capital.

North London

Party wall notices prepared and served across North London boroughs.

North London

South London

Party wall notices prepared and served across South London boroughs.

South London

East London

Party wall notices prepared and served across East London boroughs.

East London

West London

Party wall notices prepared and served across West London boroughs.

West London

Central London

Party wall notices prepared and served across Central London boroughs.

Central London

All Areas

See every area we cover across Greater London.

View all areas

Your Questions Answered

Party Wall Notice FAQs

How do I know if my project needs a Party Wall Notice?
The most reliable way to confirm this is to have your drawings reviewed by a party wall surveyor. As a general guide, any works that affect a shared wall, involve excavation near a neighbouring foundation or include construction at or near a boundary line are likely to be notifiable. If you are unsure, a short call with LENIO is enough to confirm whether your project falls under the Act and which notices apply.
What must a Party Wall Notice contain to be valid?
A valid notice must give the Building Owner's name and address, the address of the property where works will take place, a clear description of the proposed works, the intended start date and the date of service. Excavation notices under Section 6 must also be accompanied by drawings showing the depth and position of the proposed excavation. A vague description of the works is one of the most common reasons a notice is later challenged.
How should a Party Wall Notice be delivered?
First class post is generally the most reliable method and is well recognised. Hand delivery is also valid provided you can evidence the date and manner of delivery. Email is only valid if the Adjoining Owner has confirmed in writing that they will accept notices electronically. Recorded delivery is best avoided, because if nobody is home to sign, the notice is not delivered and therefore not served.
How far in advance do I need to serve a Party Wall Notice?
It depends on the type of notice. A Section 3 notice requires two months before works begin. A Section 1 or Section 6 notice requires one month. These periods cannot be shortened without your neighbour’s written agreement. The safest approach is to begin the notice process as early as possible, before your contractor is booked and your start date is fixed.
Can I serve a Party Wall Notice myself?
Yes. The Act does not require a surveyor to serve the notice, and free templates are widely available. However, an incorrectly drafted or served notice can be invalid, which means the full notice period must restart from scratch. Templates work reasonably well for simple works and a co-operative neighbour. Where the works are complex or the relationship is delicate, a professionally drafted notice removes the validity risk from the outset.
What happens if I serve notice on the wrong person?
If a Party Wall Notice is served on the wrong person or misses an affected Adjoining Owner, the notice may be invalid for that owner. In that case, a fresh notice must be served and the full notice period begins again. Addressing a notice to "the occupier" rather than the legal owner is a frequent cause of this. LENIO identifies every affected Adjoining Owner using Land Registry checks as part of the initial review.
What happens if my neighbour ignores the notice completely?
Silence for 14 days is treated as dissent under the Act, so a dispute is deemed to have arisen. A further written request is then served giving your neighbour 10 days to appoint a surveyor, under section 10(4). If they still do not appoint anyone, you are entitled to appoint a surveyor on their behalf. That surveyor must act impartially, so your neighbour remains protected, and your project is not held up indefinitely.
Can my neighbour refuse to accept a Party Wall Notice?
A neighbour may decline to engage, but valid service can still be achieved using permitted service methods under the Act. These include delivery by post to the property address and, in certain circumstances, other methods where personal service is not possible. We advise on the correct method of service for your specific situation and ensure the notice is properly served regardless of your neighbour’s response.
How long is a Party Wall Notice valid for?
Twelve months from the date of service. If the works covered by the notice have not started within that year, the notice lapses and fresh notices must be served before proceeding. The works do not need to be finished within the twelve months, only started. This catches out projects delayed by planning, funding or contractor availability.
Do I need separate notices for each neighbour?
Yes. A separate Party Wall Notice must be served on each affected Adjoining Owner. In a terraced property, this may mean serving notices on two or more neighbours, depending on the works proposed. In a block of converted flats it can mean serving several leaseholders and the freeholder. LENIO prepares and serves individual notices for each affected Adjoining Owner as part of the standard notice process.
Can the notice period be shortened?
The statutory notice period can only be shortened if the Adjoining Owner provides written agreement to an earlier start date. This is known as a notice period waiver and must be confirmed in writing before works begin. In practice, some neighbours are happy to agree to a shorter period. We can advise on whether this is appropriate for your situation.
What if works start without a Party Wall Notice being served?
If notifiable works proceed without a valid Party Wall Notice, the Adjoining Owner can apply to court for an injunction to stop them. The Building Owner also loses the legal protections the Act provides, including the right of access to a neighbour's land where that is needed to carry out the works. Non-compliance can also surface later when you come to sell, as buyers and their solicitors look for evidence that the Act was followed. Acting before works begin is always the better position, but if works have already started we can advise on the correct steps from where you are now.

Ready to Serve Your Party Wall Notice?

Whether your project is at the planning stage or your contractor is already booked, the right first step is to confirm which notices apply. LENIO provides free initial advice to Building Owners across London on party wall notice requirements. There is no obligation.

Note: This page is general guidance only and does not constitute legal advice. Party wall matters are subject to the specific circumstances of each project. LENIO recommends seeking professional advice before taking any formal steps under the Party Wall etc. Act 1996.